methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for PDCA Cycle.
Operations
PDCA Cycle
Paper illustration for Kaizen Event.
Operations
Kaizen Event
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Purposedifferent
For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode.For a tightly scoped process segment with noticeable waste, the method bundles shared energy for change. It suits situations that call for fast learning loops and visible adjustments.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.
Complexitydifferent
LowMediumHighLow
Timedifferent
1 h bis mehrere Wochen0.5-5 Tage2-8 h60-90 min
Participantsdifferent
1-84-102-84-10
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
PDCA Log, Experiment Plan, Learning Outcome, Standard ChangeKaizen Charter, Waste List, Improvement Experiments, Standard Work UpdateProblem Analysis, Decision Analysis, Risk PlanProblem Cluster, Prioritized Challenge, Experiment
Tagsno overlap
Continuous improvementLeanExperiments
LeanContinuous improvementOperations
Problem solvingRoot causeDecisionOperations
FacilitationDecisionProblem solvingWorkshop
Add more methods