methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for PDCA Cycle.
Operations
PDCA Cycle
Paper illustration for DMAIC.
Operations
DMAIC
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Paper illustration: scenarios and architectural decisions are connected to identified risks.
Architecture
ATAM (Architecture Tradeoff Analysis Method)
Purposedifferent
For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode.For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.ATAM helps teams weigh architecture decisions when quality goals compete. The team considers business goals, stakeholder expectations, and technical decisions together. The evaluation shows which risks need further investigation.
Complexitydifferent
LowHighLowHigh
Timedifferent
1 h bis mehrere Wochen2-12 Wochen1-2 TageSeveral meetings plus preparation and analysis; total effort depends on scope
Participantsdifferent
1-83-101-4Evaluation team, architects, and relevant stakeholders
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
PDCA Log, Experiment Plan, Learning Outcome, Standard ChangeProject Charter, Measurement Plan, Cause Analysis, Control PlanArchitecture Document, Context View, Runtime View, Deployment ViewPrioritized quality scenarios in a utility tree, Architecture risks with reasoning and assumptions, Sensitivity and trade-off points, Findings report with open investigations
Tagsno overlap
Continuous improvementLeanExperiments
Continuous improvementQualityProcess improvement
ArchitectureDocumentationCommunication
ArchitectureQualityRiskTradeoffsStakeholders
Add more methods