methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for PDCA Cycle.
Operations
PDCA Cycle
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Paper illustration for Risk Storming.
Architecture
Risk Storming
Purposedifferent
For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.Helps clarify architecture context, options, and consequences in concrete terms. It organizes technical context, alternatives, and consequences. The result is captured as an Annotated Diagram, a Prioritized Risk List, and an Action Backlog.
Complexitydifferent
LowLowMediumLow
Timedifferent
1 h bis mehrere Wochen15-45 min45-60 min60-90 min
Participantsdifferent
1-81-32-84-12
Formatdifferent
Workshop + asyncAsyncWorkshop + asyncWorkshop
Outputdifferent
PDCA Log, Experiment Plan, Learning Outcome, Standard ChangeADR File, Decision Log, RationaleAssumption map, Test backlog, Risk rankingAnnotated Diagram, Prioritized Risk List, Action Backlog
Tagsno overlap
Continuous improvementLeanExperiments
ArchitectureRationaleDocumentationGovernance
AssumptionsRiskExperimentsValidation
RiskArchitectureWorkshopValidation
Add more methods