View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations PDCA Cycle | ![]() Growth A/B Testing | ![]() Product Discovery Fake Door Test | ![]() Product Discovery Learning Card |
|---|---|---|---|---|
Purposedifferent | For an improvement that still has to prove itself in everyday work, the method runs it through small learning loops. It connects planning, checking, and standardization into a repeatable learning mode. | When two variants compete, discussions quickly decide by taste rather than effect. A/B Testing checks behavior under controlled conditions and separates real improvement from chance or expectation effects. | When demand is still unclear, it measures interest in a feature before it is built. It separates real behavior from polite agreement and deliberately keeps build effort small. | The Learning Card connects traceable test results to a reasoned next action while keeping the limits of the insight visible. |
Complexitydifferent | Low | High | Medium | Low |
Timedifferent | 1 h bis mehrere Wochen | 1-4 Wochen | 1-5 Tage | 25-40 min |
Participantsdifferent | 1-8 | 1-6 | Nutzertraffic | 1-5 |
Formatdifferent | Workshop + async | Async | Async | Workshop + async |
Outputdifferent | PDCA Log, Experiment Plan, Learning Outcome, Standard Change | Experiment results, Decision log, Learning summary | Click Data, Interest Signal, Learning Decision | Learning Card with evidence and next action |
Tags1 shared | Continuous improvementLeanExperiments | ExperimentsGrowthAnalyticsValidation | ValidationExperimentsDemandDiscovery | ExperimentsValidationDiscoveryLearning |



