methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for OODA Loop.
Decision Making
OODA Loop
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Purposedifferent
In dynamic situations, decisions become outdated faster than they can be prepared. The OODA Loop holds observing, orienting, deciding, and acting together as a recurring rhythm so reaction does not slide into inertia.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.
Complexitydifferent
MediumHighHighHigh
Timedifferent
15-60 min je ZyklusHalf day90-180 min2-4 h
Participantsdifferent
1-83-123-83-8
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
Situation Assessment, Decision Loop, Action UpdatesLeverage Map, Action StrategyCoD Table, Prioritization SequenceFuture Reality Tree, Negative Branches, Assumption List, Improved Injections
Tagsno overlap
DecisionChangeLearningStrategy
Systems thinkingChangeStrategy
PrioritizationDeliveryEconomicsDecision
Theory of ConstraintsSystems thinkingChange
Add more methods