methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for OODA Loop.
Decision Making
OODA Loop
Paper illustration of an IBIS map with issues, positions and arguments
Knowledge Modeling
IBIS
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Paper illustration of the McKinsey 7S Framework with seven connected fields
Business Strategy
McKinsey 7S
Purposedifferent
In dynamic situations, decisions become outdated faster than they can be prepared. The OODA Loop holds observing, orienting, deciding, and acting together as a recurring rhythm so reaction does not slide into inertia.IBIS structures thinking about complex questions as a sequence of issues, ideas, and arguments. The method keeps discussions open without forcing them into premature consensus.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.McKinsey 7S checks whether Strategy, Structure, Systems, Shared Values, Skills, Style, and Staff fit together. Organizational misalignments become visible across multiple levers as a result.
Complexitydifferent
MediumMediumLowMedium
Timedifferent
15-60 min je Zyklus1-3 h30-60 min2-4 h
Participantsdifferent
1-82-82-83-12
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Situation Assessment, Decision Loop, Action UpdatesIssue Map, Positions, Argument NotesPower Interest Grid, Strategy per Stakeholder7S Assessment, Alignment Gaps, Change Actions
Tagsno overlap
DecisionChangeLearningStrategy
RationaleKnowledgeDecision
StakeholdersFacilitationAlignmentPlanning
OrganizationStrategyAlignmentChange
Add more methods