methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for OODA Loop.
Decision Making
OODA Loop
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Paper illustration of DIBB with its method-specific working model.
Product Strategy
DIBB
Purposedifferent
In dynamic situations, decisions become outdated faster than they can be prepared. The OODA Loop holds observing, orienting, deciding, and acting together as a recurring rhythm so reaction does not slide into inertia.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.DIBB helps clarify target groups, value, goals, and priorities by making the logic behind a decision explicit. It captures results as a DIBB document, belief list, bet list, and learning report.
Complexitydifferent
MediumHighLowLow
Timedifferent
15-60 min je Zyklus90-180 min45-90 min1-2 h
Participantsdifferent
1-83-82-82-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Situation Assessment, Decision Loop, Action UpdatesCoD Table, Prioritization SequenceAssumption List, Critical Assumptions, Learning PlanDIBB document, Belief list, Bet list, Learning report
Tags1 shared
DecisionChangeLearningStrategy
PrioritizationDeliveryEconomicsDecision
AssumptionsRiskDecisionDiscovery
StrategyDecisionAssumptionsHypothesis
Add more methods