methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for OODA Loop.
Decision Making
OODA Loop
Blameless Postmortem workspace showing the question, observations, and next decision.
DevOps
Blameless Postmortem
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Purposedifferent
In dynamic situations, decisions become outdated faster than they can be prepared. The OODA Loop holds observing, orienting, deciding, and acting together as a recurring rhythm so reaction does not slide into inertia.After an incident with damage or a near miss, the method creates a sober field for learning without assigning blame. It directs attention to the course of events, conditions, and effective countermeasures.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.
Complexitydifferent
MediumMediumLowHigh
Timedifferent
15-60 min je Zyklus30-90 min15-30 min2-8 h
Participantsdifferent
1-83-122-62-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Situation Assessment, Decision Loop, Action UpdatesPostmortem Doc, Action Items, TimelineRoot cause notes, CountermeasuresProblem Analysis, Decision Analysis, Risk Plan
Tagsno overlap
DecisionChangeLearningStrategy
Site Reliability EngineeringIncidentLearningReliability
Root causeIncidentLeanProblem solving
Problem solvingRoot causeDecisionOperations
Add more methods