methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for NoEstimates.
Agile
NoEstimates
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Purposedifferent
When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.
Complexitydifferent
MediumMediumLowLow
Timedifferent
laufend10-30 min je Item15-45 min1-2 Tage
Participantsdifferent
2-121-81-31-4
Formatdifferent
Workshop + asyncWorkshop + asyncAsyncWorkshop + async
Outputdifferent
Throughput Data, Flow Forecast, Slicing RulesThree-Point Estimate, Risk Range, Assumption NotesADR File, Decision Log, RationaleArchitecture Document, Context View, Runtime View, Deployment View
Tagsno overlap
EstimationForecastingFlow
EstimationUncertaintyForecasting
ArchitectureRationaleDocumentationGovernance
ArchitectureDocumentationCommunication
Add more methods