View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Agile NoEstimates | ![]() Systems Thinking Intervention Mapping | ![]() Decision Making Three-Point Estimation | ![]() Systems Thinking Future Reality Tree |
|---|---|---|---|---|
Purposedifferent | When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules. | Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain. | A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. |
Complexitydifferent | Medium | High | Medium | High |
Timedifferent | laufend | 1-5 Tage | 10-30 min je Item | 2-4 h |
Participantsdifferent | 2-12 | 4-12 | 1-8 | 3-8 |
Formatdifferent | Workshop + async | Workshop + async | Workshop + async | Workshop |
Outputdifferent | Throughput Data, Flow Forecast, Slicing Rules | Logic Model, Change Objectives, Intervention Components, Evaluation Plan | Three-Point Estimate, Risk Range, Assumption Notes | Future Reality Tree, Negative Branches, Assumption List, Improved Injections |
Tagsno overlap | EstimationForecastingFlow | ChangeSystems thinkingCapability | EstimationUncertaintyForecasting | Theory of ConstraintsSystems thinkingChange |



