View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Agile NoEstimates | ![]() Systems Thinking Future Reality Tree | ![]() Decision Making Wideband Delphi | ![]() Systems Thinking Intervention Mapping |
|---|---|---|---|---|
Purposedifferent | When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | A single opinion rarely holds up for planning when the future is genuinely uncertain. It separates options, evaluation criteria, and open risks. The result is captured as an Estimate Range, Assumption Log, and Expert Consensus Notes. | Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain. |
Complexitydifferent | Medium | High | High | High |
Timedifferent | laufend | 2-4 h | 1-4 h or multiple rounds | 1-5 Tage |
Participantsdifferent | 2-12 | 3-8 | 4-12 Experten | 4-12 |
Formatdifferent | Workshop + async | Workshop | Workshop + async | Workshop + async |
Outputdifferent | Throughput Data, Flow Forecast, Slicing Rules | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Estimate Range, Assumption Log, Expert Consensus Notes | Logic Model, Change Objectives, Intervention Components, Evaluation Plan |
Tagsno overlap | EstimationForecastingFlow | Theory of ConstraintsSystems thinkingChange | EstimationExpertsForecasting | ChangeSystems thinkingCapability |



