methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for NoEstimates.
Agile
NoEstimates
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Paper illustration for Affinity Estimation.
Agile
Affinity Estimation
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Purposedifferent
When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.When many tasks need to be classified quickly, it sorts them by perceived effort and similarity. It reduces the effort of fine-grained estimation for large volumes.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.
Complexitydifferent
MediumHighMediumHigh
Timedifferent
laufend2-4 h30-90 minHalf day
Participantsdifferent
2-123-83-123-12
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
Throughput Data, Flow Forecast, Slicing RulesFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsAffinity Size Map, Grouped Estimates, Unclear ItemsLeverage Map, Action Strategy
Tagsno overlap
EstimationForecastingFlow
Theory of ConstraintsSystems thinkingChange
EstimationBacklogRelative sizing
Systems thinkingChangeStrategy
Add more methods