methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for NoEstimates.
Agile
NoEstimates
Paper illustration for Change Analysis.
Operations
Change Analysis
Paper illustration for Fault Tree Analysis.
Operations
Fault Tree Analysis
Paper illustration for Failure Mode and Effects Analysis
Operations
Failure Mode and Effects Analysis
Purposedifferent
When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.For a deviation after a change, the method isolates the influence of the altered condition. It narrows down which differences are relevant and which are just accompanying noise.For a critical top event with several possible triggers, the method logically models failure paths. It makes visible which combinations of conditions can lead to damage.For a process, product, or service with noticeable failure risks, the method assesses possible failure modes in advance. It directs attention to combinations of occurrence, effect, and detectability.
Complexitydifferent
MediumMediumHighHigh
Timedifferent
laufend45-120 min2-6 h2-6 h
Participantsdifferent
2-122-63-83-10
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Throughput Data, Flow Forecast, Slicing RulesChange Matrix, Cause Hypotheses, Validation Questions, Action ListFault Tree, Critical Paths, Cause Hypotheses, Control ActionsFMEA Table, Risk Priority, Mitigation Actions
Tagsno overlap
EstimationForecastingFlow
ChangeRoot causeTroubleshootingComparison
RiskRoot causeSafety
RiskQualityOperationsRoot cause
Add more methods