methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of the McKinsey 7S Framework with seven connected fields
Business Strategy
McKinsey 7S
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Systems Mapping method illustration showing its working structure
Systems Thinking
Systems Mapping
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Purposedifferent
McKinsey 7S checks whether Strategy, Structure, Systems, Shared Values, Skills, Style, and Staff fit together. Organizational misalignments become visible across multiple levers as a result.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.Systems Mapping arranges elements, relationships, and boundaries so a complex field becomes legible at a glance. The overview stabilizes the overall picture before detail work or steering begins.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.
Complexitydifferent
MediumHighMediumHigh
Timedifferent
2-4 hHalf day1-3 h2-4 h
Participantsdifferent
3-123-123-123-8
Formatdifferent
WorkshopWorkshopWorkshop + asyncWorkshop
Outputdifferent
7S Assessment, Alignment Gaps, Change ActionsLeverage Map, Action StrategySystem Map, Dependencies, Leverage PointsFuture Reality Tree, Negative Branches, Assumption List, Improved Injections
Tags1 shared
OrganizationStrategyAlignmentChange
Systems thinkingChangeStrategy
Systems thinkingMappingBoundariesChange
Theory of ConstraintsSystems thinkingChange
Add more methods