methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Stakeholder Mapping
Facilitation
Stakeholder Mapping
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Purposedifferent
Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When an initiative depends on many people, interests, and power dynamics, Stakeholder Mapping systematically orders the environment. It shows who influences, who is affected, and where relationship management or safeguarding matters first.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.
Complexitydifferent
HighMediumLowLow
Timedifferent
Half dayOngoing60–90 min30-60 min
Participantsdifferent
3-122-122-82-8
Formatdifferent
WorkshopWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Leverage Map, Action StrategyKanban board, WIP policies, Flow metricsStakeholder Map, Engagement Plan, Risk NotesPower Interest Grid, Strategy per Stakeholder
Tagsno overlap
Systems thinkingChangeStrategy
FlowVisual managementDelivery
StakeholdersAlignmentFacilitationChange
StakeholdersFacilitationAlignmentPlanning
Add more methods