methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Paper illustration for Bucket System.
Agile
Bucket System
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Purposedifferent
Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.When a large batch of work needs a fast, rough estimate, it sorts items into predefined size buckets. It sorts work by value, risk, and delivery ability. The result is captured as a Bucketed Backlog, Relative Estimates, and Split Candidates.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable.
Complexitydifferent
HighMediumLowMedium
Timedifferent
Half day30-90 min30-60 min1-2 h
Participantsdifferent
3-123-122-84-12
Formatsame
WorkshopWorkshopWorkshopWorkshop
Outputdifferent
Leverage Map, Action StrategyBucketed Backlog, Relative Estimates, Split CandidatesPower Interest Grid, Strategy per StakeholderAlignment Map, Open Issues, Decision Questions
Tagsno overlap
Systems thinkingChangeStrategy
EstimationBacklogRelative sizing
StakeholdersFacilitationAlignmentPlanning
AlignmentStakeholdersStrategyFacilitation
Add more methods