methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Purposedifferent
Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.
Complexitydifferent
HighMediumHighLow
Timedifferent
Half day1-2 h2-4 h30-60 min
Participantsdifferent
3-124-123-82-8
Formatsame
WorkshopWorkshopWorkshopWorkshop
Outputdifferent
Leverage Map, Action StrategyAlignment Map, Open Issues, Decision QuestionsFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsPower Interest Grid, Strategy per Stakeholder
Tagsno overlap
Systems thinkingChangeStrategy
AlignmentStakeholdersStrategyFacilitation
Theory of ConstraintsSystems thinkingChange
StakeholdersFacilitationAlignmentPlanning
Add more methods