methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a Lean Canvas with nine fields, notes, and one highlighted learning risk.
Product Strategy
Lean Canvas
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
Purposedifferent
When an early product bet still has too many open points, it brings target group, problem, and assumptions into a single view. It condenses the idea so core risks become nameable.When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.
Complexitydifferent
MediumMediumHighMedium
Timedifferent
45-90 minOngoing2-4 h1-3 h
Participantsdifferent
1-62-123-84-10
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Lean Canvas, Core Assumptions, Experiment BacklogKanban board, WIP policies, Flow metricsFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsCurrent-state map, Future-state map, Bottleneck list
Tagsno overlap
StartupLeanAssumptionsBusiness model
FlowVisual managementDelivery
Theory of ConstraintsSystems thinkingChange
LeanFlowWasteDelivery
Add more methods