methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
HighHighLowLow
Timedifferent
2-8 h90-180 min30-60 min15-30 min
Participantsdifferent
2-83-83-102-6
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
Problem Analysis, Decision Analysis, Risk PlanCoD Table, Prioritization SequenceRisk Matrix, Top Risk ListRoot cause notes, Countermeasures
Tagsno overlap
Problem solvingRoot causeDecisionOperations
PrioritizationDeliveryEconomicsDecision
RiskDecisionPrioritizationAssessment
Root causeIncidentLeanProblem solving
Add more methods