methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration of the Lightning Decision Jam working structure.
Facilitation
Decision Jam
Paper illustration for ABC Analysis
Operations
ABC Analysis
Purposedifferent
For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.When a decision is stuck, Decision Jam loosens the knot through structured separation of problem, idea, and selection. The format creates movement without jumping prematurely at the first seemingly elegant answer.With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention.
Complexitydifferent
HighHighLowLow
Timedifferent
2-8 h90-180 min60-90 min30-60 min
Participantsdifferent
2-83-84-101-5
Formatdifferent
Workshop + asyncWorkshopWorkshopAsync
Outputdifferent
Problem Analysis, Decision Analysis, Risk PlanCoD Table, Prioritization SequenceProblem Cluster, Prioritized Challenge, ExperimentABC Classification, Focus Rules, Control List
Tagsno overlap
Problem solvingRoot causeDecisionOperations
PrioritizationDeliveryEconomicsDecision
FacilitationDecisionProblem solvingWorkshop
PrioritizationOperationsPortfolio
Add more methods