methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration for ABC Analysis
Operations
ABC Analysis
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.With many similar objects of differing economic significance, the method prioritizes effort by effect. It separates what needs regular steering from what rarely needs attention.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
HighHighLowLow
Timedifferent
2-8 h90-180 min30-60 min15-30 min
Participantsdifferent
2-83-81-52-6
Formatdifferent
Workshop + asyncWorkshopAsyncWorkshop
Outputdifferent
Problem Analysis, Decision Analysis, Risk PlanCoD Table, Prioritization SequenceABC Classification, Focus Rules, Control ListRoot cause notes, Countermeasures
Tagsno overlap
Problem solvingRoot causeDecisionOperations
PrioritizationDeliveryEconomicsDecision
PrioritizationOperationsPortfolio
Root causeIncidentLeanProblem solving
Add more methods