View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Operations Kepner-Tregoe | ![]() Operations ALPEN Method | ![]() Operations MORT Analysis | ![]() Operations Barrier Analysis |
|---|---|---|---|---|
Purposedifferent | For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations. | With an overloaded day full of too many tasks, a realistic picture of the day emerges. The method connects estimating, deciding, and buffer thinking so planning fits available energy and time. | For a safety-relevant event or a system with high protection requirements, the method examines where controls failed. It exposes both technical and organizational gaps. | For a risk that can only be managed through multiple layers of protection, the method examines the effectiveness of each barrier. It shows where safeguards are missing, too weak, or fail under real conditions. |
Complexitydifferent | High | Low | High | Medium |
Timedifferent | 2-8 h | 10-20 min daily | Mehrere Tage bis Wochen | 2-4 h |
Participantsdifferent | 2-8 | 1 | 2-6 | 2-6 |
Formatdifferent | Workshop + async | Async | Workshop + async | Workshop + async |
Outputdifferent | Problem Analysis, Decision Analysis, Risk Plan | Daily Plan, Time Estimates, Review Notes | MORT Worksheets, Findings per Branch, Corrective Actions, Systemic Recommendations | Barrier Inventory, Failure Analysis per Barrier, Action Backlog |
Tagsno overlap | Problem solvingRoot causeDecisionOperations | PlanningTime managementProductivityOperations | Root causeSafetySystemicIncident | Root causeSafetyIncident |