methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.
Complexitydifferent
MediumMediumHighHigh
Timedifferent
Ongoing1-3 hHalf day2-4 h
Participantsdifferent
2-124-103-123-8
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
Kanban board, WIP policies, Flow metricsCurrent-state map, Future-state map, Bottleneck listLeverage Map, Action StrategyFuture Reality Tree, Negative Branches, Assumption List, Improved Injections
Tagsno overlap
FlowVisual managementDelivery
LeanFlowWasteDelivery
Systems thinkingChangeStrategy
Theory of ConstraintsSystems thinkingChange
Add more methods