methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
A/B Testing workspace showing the question, observations, and next decision.
Growth
A/B Testing
Paper illustration of a calm four-quadrant Assumption Map with hypothesis cards and emphasis on important assumptions with little evidence.
Product Discovery
Assumption Mapping
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.When two variants compete, discussions quickly decide by taste rather than effect. A/B Testing checks behavior under controlled conditions and separates real improvement from chance or expectation effects.When assumptions still sit unordered in the room, it weighs uncertainty against leverage. It makes visible which hypotheses should be checked first.
Complexitydifferent
MediumMediumHighMedium
Timedifferent
Ongoing1-3 h1-4 Wochen45-60 min
Participantsdifferent
2-124-101-62-8
Formatdifferent
Workshop + asyncWorkshopAsyncWorkshop + async
Outputdifferent
Kanban board, WIP policies, Flow metricsCurrent-state map, Future-state map, Bottleneck listExperiment results, Decision log, Learning summaryAssumption map, Test backlog, Risk ranking
Tagsno overlap
FlowVisual managementDelivery
LeanFlowWasteDelivery
ExperimentsGrowthAnalyticsValidation
AssumptionsRiskExperimentsValidation
Add more methods