Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration for Intervention Mapping.
Systems Thinking
Intervention Mapping
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.Intervention Mapping translates a need for change into a planned, evaluable program. The method connects target group, determinants, actions, and measurement into a traceable chain.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.
Complexitydifferent
MediumMediumHighHigh
Timedifferent
Ongoing10-30 min je Item1-5 Tage2-4 h
Participantsdifferent
2-121-84-123-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Kanban board, WIP policies, Flow metricsThree-Point Estimate, Risk Range, Assumption NotesLogic Model, Change Objectives, Intervention Components, Evaluation PlanFuture Reality Tree, Negative Branches, Assumption List, Improved Injections
Tagsno overlap
FlowVisual managementDelivery
EstimationUncertaintyForecasting
ChangeSystems thinkingCapability
Theory of ConstraintsSystems thinkingChange
Add more methods