methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration for Flywheel.
Growth
Flywheel
Paper illustration of Hooked Model with its method-specific working model.
Growth
Hooked Model
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.Growth often breaks down where a reinforcing mechanism builds up too much friction. A Flywheel shows the cycle of value, repetition, and reinforcement meant to sustain growth.The Hooked Model helps clarify engagement loops, user behavior, and experiments. It makes repeat behavior measurable and captures the result as a hooked loop, trigger map, and reward design.
Complexitysame
MediumMediumMediumMedium
Timedifferent
Ongoing10-30 min je Item60-120 minMultiple workshops over several weeks
Participantsdifferent
2-121-83-82-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Kanban board, WIP policies, Flow metricsThree-Point Estimate, Risk Range, Assumption NotesFlywheel Map, Friction Points, Growth Levers, Experiment BacklogHooked loop, Trigger map, Reward design, Ethics check
Tagsno overlap
FlowVisual managementDelivery
EstimationUncertaintyForecasting
GrowthRetentionConversion
GrowthBehaviorRetention
Add more methods