Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration of a calibrated five-by-five risk matrix with response cards.
Decision Making
Risk Matrix
Paper illustration of an assumption matrix with prioritized test cards
Decision Making
Assumption Surfacing
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When a project faces many possible disruptions, it quickly becomes unclear which risks deserve attention first. It separates options, evaluation criteria, and open risks. The result is captured as a Risk Matrix and a Top Risk List.Plans often contain assumptions that were never openly stated and remain dangerous precisely because of that. Assumption Surfacing makes these silent premises visible and prioritizes which of them carry the initiative or could sink it.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.
Complexitydifferent
MediumLowLowHigh
Timedifferent
Ongoing30-60 min45-90 min90-180 min
Participantsdifferent
2-123-102-83-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Kanban board, WIP policies, Flow metricsRisk Matrix, Top Risk ListAssumption List, Critical Assumptions, Learning PlanCoD Table, Prioritization Sequence
Tagsno overlap
FlowVisual managementDelivery
RiskDecisionPrioritizationAssessment
AssumptionsRiskDecisionDiscovery
PrioritizationDeliveryEconomicsDecision