methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration of RAID Log with a method-specific labelled workspace.
Delivery
RAID Log
Paper illustration for Communication Plan
Delivery
Communication Plan
A hypothetical failure makes concrete risks, signals, and fitting mitigations visible.
Decision Making
Pre-Mortem
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.Helps clarify scope, sequence, and delivery flow in concrete terms. It makes work, boundaries, and order steerable. The result is captured as a RAID Log and a source for status reporting.When many people need to be informed in parallel and messages would otherwise arrive unevenly or too late, a Communication Plan orders communication reliably. Channels, audiences, and cadences interlock so important information doesn't get lost.In early initiatives with many uncertainties, planning quickly turns too optimistic. A pre-mortem makes the expected failure visible in advance and sharpens the view of causes, gaps, and countermeasures.
Complexitydifferent
MediumLowLowLow
Timedifferent
Ongoing30 min Setup, dann laufend45-90 min20–45 min
Participantsdifferent
2-121-3 maintaining, briefing for everyone2-6Small cross-functional group
Formatdifferent
Workshop + asyncAsyncWorkshop + asyncWorkshop
Outputdifferent
Kanban board, WIP policies, Flow metricsRAID Log, Status Report SourceCommunication Plan, Channel Matrix, Message CadenceRisk list, Mitigation plan, Assumption log
Tagsno overlap
FlowVisual managementDelivery
RiskTrackingStakeholdersGovernance
CommunicationStakeholdersDeliveryPlanning
RiskDecisionFailurePlanning
Add more methods