methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for OODA Loop.
Decision Making
OODA Loop
Paper illustration of Leverage Points with its method-specific working model.
Systems Thinking
Leverage Points
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.In dynamic situations, decisions become outdated faster than they can be prepared. The OODA Loop holds observing, orienting, deciding, and acting together as a recurring rhythm so reaction does not slide into inertia.Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.
Complexitydifferent
MediumMediumHighHigh
Timedifferent
Ongoing15-60 min je ZyklusHalf day90-180 min
Participantsdifferent
2-121-83-123-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Kanban board, WIP policies, Flow metricsSituation Assessment, Decision Loop, Action UpdatesLeverage Map, Action StrategyCoD Table, Prioritization Sequence
Tagsno overlap
FlowVisual managementDelivery
DecisionChangeLearningStrategy
Systems thinkingChangeStrategy
PrioritizationDeliveryEconomicsDecision
Add more methods