methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Iceberg Model method illustration showing its working structure
Systems Thinking
Iceberg Model
Paper illustration for Behavior Over Time Graph.
Systems Thinking
Behavior Over Time Graph
Paper illustration for Current Reality Tree
Systems Thinking
Current Reality Tree
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.The Iceberg Model separates visible events from patterns, structures, and mental models. This turns a single observation into a deeper understanding of why a problem keeps recurring.A Behavior Over Time Graph shows how a metric or observation develops over time. The method makes trends, breaks, and recurring patterns visible that get lost in snapshots.A Current Reality Tree condenses many symptoms into a few causal chains. The method makes visible which core problems drive several negative effects at once.
Complexitydifferent
MediumLowLowHigh
Timedifferent
Ongoing30-60 min20-45 min2-6 h
Participantsdifferent
2-122-101-103-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Kanban board, WIP policies, Flow metricsIceberg Worksheet, Pattern Notes, Intervention IdeasBehavior Over Time Graph, Trend Hypotheses, Key EventsCurrent Reality Tree, Core Problems, Intervention Ideas
Tagsno overlap
FlowVisual managementDelivery
Systems thinkingRoot causePatterns
Systems thinkingPatternsDynamics
Systems thinkingRoot causeConstraintsCausality
Add more methods