methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration of Hooked Model with its method-specific working model.
Growth
Hooked Model
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
Paper illustration for Waste Analysis.
Operations
Waste Analysis
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.The Hooked Model helps clarify engagement loops, user behavior, and experiments. It makes repeat behavior measurable and captures the result as a hooked loop, trigger map, and reward design.When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.For a process that keeps people busy but creates little value, the method exposes waste. It directs attention to unnecessary movement, waiting times, rework, and overdelivery.
Complexitydifferent
MediumMediumMediumLow
Timedifferent
OngoingMultiple workshops over several weeks1-3 h45-120 min
Participantsdifferent
2-122-84-102-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Kanban board, WIP policies, Flow metricsHooked loop, Trigger map, Reward design, Ethics checkCurrent-state map, Future-state map, Bottleneck listWaste Map, Prioritized Waste, Improvement Backlog
Tagsno overlap
FlowVisual managementDelivery
GrowthBehaviorRetention
LeanFlowWasteDelivery
WasteLeanProcess improvement
Add more methods