View methods side by side.
Choose up to four methods. Add them using the search and share the comparison by copying its link.
| Criterion | ![]() Engineering Kanban | ![]() Systems Thinking Future Reality Tree | ![]() Delivery Value Stream Mapping | ![]() Systems Thinking Leverage Points |
|---|---|---|---|---|
Purposedifferent | When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable. | A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation. | When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible. | Leverage Points show exactly where interventions in a system produce a disproportionate effect. It draws relationships, patterns, and feedback loops. The result is captured as a leverage map and action strategy. |
Complexitydifferent | Medium | High | Medium | High |
Timedifferent | Ongoing | 2-4 h | 1-3 h | Half day |
Participantsdifferent | 2-12 | 3-8 | 4-10 | 3-12 |
Formatdifferent | Workshop + async | Workshop | Workshop | Workshop |
Outputdifferent | Kanban board, WIP policies, Flow metrics | Future Reality Tree, Negative Branches, Assumption List, Improved Injections | Current-state map, Future-state map, Bottleneck list | Leverage Map, Action Strategy |
Tagsno overlap | FlowVisual managementDelivery | Theory of ConstraintsSystems thinkingChange | LeanFlowWasteDelivery | Systems thinkingChangeStrategy |



