methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Evaporating Cloud.
Systems Thinking
Evaporating Cloud
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration for NoEstimates.
Agile
NoEstimates
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.
Complexitysame
MediumMediumMediumMedium
Timedifferent
Ongoing60-120 min10-30 min je Itemlaufend
Participantsdifferent
2-122-81-82-12
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop + async
Outputdifferent
Kanban board, WIP policies, Flow metricsConflict Cloud, Assumption List, Breakthrough Ideas, Next ExperimentsThree-Point Estimate, Risk Range, Assumption NotesThroughput Data, Flow Forecast, Slicing Rules
Tagsno overlap
FlowVisual managementDelivery
Theory of ConstraintsAssumptionsSystems thinking
EstimationUncertaintyForecasting
EstimationForecastingFlow
Add more methods