methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Evaporating Cloud.
Systems Thinking
Evaporating Cloud
Paper illustration for NoEstimates.
Agile
NoEstimates
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict.When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.
Complexitydifferent
MediumMediumMediumHigh
Timedifferent
Ongoing60-120 minlaufend2-4 h
Participantsdifferent
2-122-82-123-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
Kanban board, WIP policies, Flow metricsConflict Cloud, Assumption List, Breakthrough Ideas, Next ExperimentsThroughput Data, Flow Forecast, Slicing RulesFuture Reality Tree, Negative Branches, Assumption List, Improved Injections
Tagsno overlap
FlowVisual managementDelivery
Theory of ConstraintsAssumptionsSystems thinking
EstimationForecastingFlow
Theory of ConstraintsSystems thinkingChange
Add more methods