methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Domain Context Map
Domain Modeling
Domain Context Map
Paper illustration for Future Reality Tree.
Systems Thinking
Future Reality Tree
Paper illustration for Evaporating Cloud.
Systems Thinking
Evaporating Cloud
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When a domain model and its associated contexts need to be thought through together, it creates a shared overview. It connects the business view and organizational boundary into a readable whole.A Future Reality Tree shows how desired actions are meant to lead to a better system state. The method checks whether a path of change holds together logically before time flows into implementation.The method makes visible why two seemingly incompatible demands arise and which assumption must be tested to resolve the conflict.
Complexitydifferent
MediumMediumHighMedium
Timedifferent
Ongoing1-3 h2-4 h60-120 min
Participantsdifferent
2-123-103-82-8
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
Kanban board, WIP policies, Flow metricsDomain Context Map, Boundary Notes, Ownership MapFuture Reality Tree, Negative Branches, Assumption List, Improved InjectionsConflict Cloud, Assumption List, Breakthrough Ideas, Next Experiments
Tagsno overlap
FlowVisual managementDelivery
Domain-Driven DesignContextBoundaries
Theory of ConstraintsSystems thinkingChange
Theory of ConstraintsAssumptionsSystems thinking
Add more methods