methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for DMAIC.
Operations
DMAIC
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.For a process problem with fluctuating performance, the method brings analysis and improvement into a disciplined sequence. It creates a framework in which numbers, causes, and control come together.For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.
Complexitydifferent
MediumHighMedium
Timedifferent
Ongoing2-12 Wochen1-3 h
Participantsdifferent
2-123-103-8
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Kanban board, WIP policies, Flow metricsProject Charter, Measurement Plan, Cause Analysis, Control PlanBottleneck Map, Flow Metrics, Improvement Options, Follow-up Measures
Tagsno overlap
FlowVisual managementDelivery
Continuous improvementQualityProcess improvement
FlowMeasurementConstraints
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Monte Carlo Forecasting.
Delivery
Monte Carlo Forecasting
Paper illustration for Theory of Constraints.
Operations
Theory of Constraints
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
Paper illustration for 8D Problem Solving.
Operations
8D Problem Solving