methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
Paper illustration for Learning Review.
Operations
Learning Review
A structured reflection surfaces what was liked, learned, lacked, and longed for. It is a conversation format and does not validate actions automatically.
Agile
4Ls Retrospective
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.After a project phase with mixed results, the method makes learning from the individual case reusable. It connects events, decisions, and systemic conditions into robust insights.When a sprint should not only be assessed but also learned from, it captures experience in clear learning categories. It records what worked, what's missing, and what should run differently next time.
Complexitydifferent
MediumHighMediumLow
Timedifferent
Ongoing90-180 min1-3 h45–75 min
Participantsdifferent
2-123-83-10Team members involved
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
Kanban board, WIP policies, Flow metricsCoD Table, Prioritization SequenceLearning Review Notes, System Factors, Improvement Actions4Ls Board, Learning Themes, Improvement Actions
Tagsno overlap
FlowVisual managementDelivery
PrioritizationDeliveryEconomicsDecision
LearningRetrospectiveIncidentOperations
RetrospectiveLearningReflectionTeam
Add more methods