methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration of Cost of Delay with its method-specific working model.
Delivery
Cost of Delay
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Value Stream Mapping workspace showing the question, observations, and next decision.
Delivery
Value Stream Mapping
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.Helps clarify scope, order, and delivery flow in concrete terms. It makes work, constraints, and sequence manageable. The result is captured as a Cost of Delay table and prioritization sequence.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.When delivery work dissolves into wait times, handoffs, and hidden effort, Value Stream Mapping makes the actual flow visible. The method exposes bottlenecks, idle time, and feedback loops so lead time and improvement levers become tangible.
Complexitydifferent
MediumHighLowMedium
Timedifferent
Ongoing90-180 min15-30 min1-3 h
Participantsdifferent
2-123-82-64-10
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
Kanban board, WIP policies, Flow metricsCoD Table, Prioritization SequenceRoot cause notes, CountermeasuresCurrent-state map, Future-state map, Bottleneck list
Tagsno overlap
FlowVisual managementDelivery
PrioritizationDeliveryEconomicsDecision
Root causeIncidentLeanProblem solving
LeanFlowWasteDelivery
Add more methods