methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Context Map workspace showing the question, observations, and next decision.
Domain Modeling
Context Map
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When several contexts need to talk to each other, it makes their relationships and dependencies legible. It helps sort integration pressure and responsibilities across system boundaries.When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.
Complexitydifferent
MediumMediumMediumLow
Timedifferent
Ongoing1-3 h1-2 h30-60 min
Participantsdifferent
2-122-84-122-8
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Kanban board, WIP policies, Flow metricsContext Map, Integration Patterns, Boundary NotesAlignment Map, Open Issues, Decision QuestionsPower Interest Grid, Strategy per Stakeholder
Tagsno overlap
FlowVisual managementDelivery
Domain-Driven DesignBoundariesStrategy
AlignmentStakeholdersStrategyFacilitation
StakeholdersFacilitationAlignmentPlanning
Add more methods