methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration of a Concept Map with concepts and labelled links
Knowledge Modeling
Concept Mapping
Paper illustration for Waste Analysis.
Operations
Waste Analysis
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.Concept Mapping arranges terms and relationships in a network that makes subject-matter connections tangible. It fits when a topic needs to be understood structurally rather than linearly.For a process that keeps people busy but creates little value, the method exposes waste. It directs attention to unnecessary movement, waiting times, rework, and overdelivery.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
MediumMediumLowLow
Timedifferent
Ongoing1-2 h45-120 min15-30 min
Participantsdifferent
2-121-82-82-6
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop
Outputdifferent
Kanban board, WIP policies, Flow metricsConcept Map, Relationship Labels, Knowledge GapsWaste Map, Prioritized Waste, Improvement BacklogRoot cause notes, Countermeasures
Tagsno overlap
FlowVisual managementDelivery
KnowledgeConceptsMappingSensemaking
WasteLeanProcess improvement
Root causeIncidentLeanProblem solving
Add more methods