methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration of a Concept Map with concepts and labelled links
Knowledge Modeling
Concept Mapping
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
A3 Problem-Solving workspace showing the question, observations, and next decision.
Operations
A3 Problem Solving
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.Concept Mapping arranges terms and relationships in a network that makes subject-matter connections tangible. It fits when a topic needs to be understood structurally rather than linearly.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.For a complex deviation with several people involved, the method bundles problem, analysis, and decision onto one page. It creates a shared working space where causes, countermeasures, and follow-up fit together.
Complexitydifferent
MediumMediumLowMedium
Timedifferent
Ongoing1-2 h15-30 min45-90 min
Participantsdifferent
2-121-82-62-5
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshopWorkshop + async
Outputdifferent
Kanban board, WIP policies, Flow metricsConcept Map, Relationship Labels, Knowledge GapsRoot cause notes, CountermeasuresA3 Report, Action Plan, Root Cause Analysis
Tagsno overlap
FlowVisual managementDelivery
KnowledgeConceptsMappingSensemaking
Root causeIncidentLeanProblem solving
LeanProblem solvingCoachingOperations
Add more methods