methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
A paper-based illustration representing C4 Model with its core stages and visible working result.
Architecture
C4 Model
Paper illustration for NoEstimates.
Agile
NoEstimates
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.The C4 Model makes a system legible across several resolution levels, from context down to code. It suits situations where different audiences need to understand the same architecture from different altitudes.When estimating slows a team down more than it helps, it shifts the focus to flow, small slices, and real lead time. It sorts work by value, risk, and delivery ability. The result is captured as Throughput Data, Flow Forecast, and Slicing Rules.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.
Complexitydifferent
MediumLowMediumLow
Timedifferent
Ongoing1-4 hlaufend1-2 Tage
Participantsdifferent
2-121-52-121-4
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Kanban board, WIP policies, Flow metricsContext Diagram, Container Diagram, Component DiagramThroughput Data, Flow Forecast, Slicing RulesArchitecture Document, Context View, Runtime View, Deployment View
Tagsno overlap
FlowVisual managementDelivery
ArchitectureCommunicationVisualization
EstimationForecastingFlow
ArchitectureDocumentationCommunication
Add more methods