methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Bottleneck Analysis.
Operations
Bottleneck Analysis
Paper illustration for Ideal Days.
Agile
Ideal Days
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.For a flow that backs up at one point, the method looks for the capacity limit with the greatest leverage. It explains why extra effort elsewhere barely improves throughput.When effort needs to be thought of as real working time, it offers a simple common denominator for comparison. It sorts work by value, risk, and delivery ability. The result is captured as Ideal Day Estimates, Assumption Notes, and Capacity Caveats.
Complexitydifferent
MediumMediumLow
Timedifferent
Ongoing1-3 h15-60 min
Participantsdifferent
2-123-82-9
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Kanban board, WIP policies, Flow metricsBottleneck Map, Flow Metrics, Improvement Options, Follow-up MeasuresIdeal Day Estimates, Assumption Notes, Capacity Caveats
Tagsno overlap
FlowVisual managementDelivery
FlowMeasurementConstraints
EstimationEffortAgile
Add more methods

Often compared together

Methods with strong topical overlap with the current selection, not yet in the comparison.

Paper illustration for Dot Estimation.
Facilitation
Dot Estimation
Paper illustration of Dual Track Agile with its method-specific working model.
Product Discovery
Dual-Track Agile
Paper illustration for Monte Carlo Forecasting.
Delivery
Monte Carlo Forecasting