methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Blameless Postmortem workspace showing the question, observations, and next decision.
DevOps
Blameless Postmortem
Paper illustration of DIBB with its method-specific working model.
Product Strategy
DIBB
Paper illustration for OODA Loop.
Decision Making
OODA Loop
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.After an incident with damage or a near miss, the method creates a sober field for learning without assigning blame. It directs attention to the course of events, conditions, and effective countermeasures.DIBB helps clarify target groups, value, goals, and priorities by making the logic behind a decision explicit. It captures results as a DIBB document, belief list, bet list, and learning report.In dynamic situations, decisions become outdated faster than they can be prepared. The OODA Loop holds observing, orienting, deciding, and acting together as a recurring rhythm so reaction does not slide into inertia.
Complexitydifferent
MediumMediumLowMedium
Timedifferent
Ongoing30-90 min1-2 h15-60 min je Zyklus
Participantsdifferent
2-123-122-81-8
Formatsame
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop + async
Outputdifferent
Kanban board, WIP policies, Flow metricsPostmortem Doc, Action Items, TimelineDIBB document, Belief list, Bet list, Learning reportSituation Assessment, Decision Loop, Action Updates
Tagsno overlap
FlowVisual managementDelivery
Site Reliability EngineeringIncidentLearningReliability
StrategyDecisionAssumptionsHypothesis
DecisionChangeLearningStrategy
Add more methods