methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Paper illustration for Storytelling
Facilitation
Storytelling
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable.When an insight needs to have an effect, storytelling translates dry facts into a comprehensible development. It combines context, tension, and consequence into a form that people remember and pass on more easily.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.
Complexitydifferent
MediumMediumMediumLow
Timedifferent
Ongoing1-2 h45-120 min30-60 min
Participantsdifferent
2-124-121-62-8
Formatdifferent
Workshop + asyncWorkshopWorkshop + asyncWorkshop
Outputdifferent
Kanban board, WIP policies, Flow metricsAlignment Map, Open Issues, Decision QuestionsNarrative Outline, Key Message, Story ArcPower Interest Grid, Strategy per Stakeholder
Tagsno overlap
FlowVisual managementDelivery
AlignmentStakeholdersStrategyFacilitation
CommunicationNarrativeStakeholdersFacilitation
StakeholdersFacilitationAlignmentPlanning
Add more methods