methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration for Alignment Mapping.
Facilitation
Alignment Mapping
Paper illustration of the McKinsey 7S Framework with seven connected fields
Business Strategy
McKinsey 7S
Paper illustration of Power-Interest Grid with a method-specific labelled workspace.
Facilitation
Power Interest Grid
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.When several people work toward one goal but hold different mental maps, Alignment Mapping makes the discrepancies visible. It arranges goals, assumptions, and priorities so shared direction becomes verifiable.McKinsey 7S checks whether Strategy, Structure, Systems, Shared Values, Skills, Style, and Staff fit together. Organizational misalignments become visible across multiple levers as a result.When many stakeholders compete for attention at once, the Power Interest Grid sorts them by influence and stake. It turns individual contributions into a visible selection. The result is captured as a Power Interest Grid and a stakeholder-specific strategy.
Complexitydifferent
MediumMediumMediumLow
Timedifferent
Ongoing1-2 h2-4 h30-60 min
Participantsdifferent
2-124-123-122-8
Formatdifferent
Workshop + asyncWorkshopWorkshopWorkshop
Outputdifferent
Kanban board, WIP policies, Flow metricsAlignment Map, Open Issues, Decision Questions7S Assessment, Alignment Gaps, Change ActionsPower Interest Grid, Strategy per Stakeholder
Tagsno overlap
FlowVisual managementDelivery
AlignmentStakeholdersStrategyFacilitation
OrganizationStrategyAlignmentChange
StakeholdersFacilitationAlignmentPlanning
Add more methods