methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration of a review with planned work, actual event sequence, comparison, and assigned improvement actions.
Operations
After-Action Review
Paper illustration for Kepner-Tregoe
Operations
Kepner-Tregoe
A 5 Whys working surface connects an observable problem with evidenced causes, marked uncertainty and concrete countermeasures with ownership.
Operations
5 Whys
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.After missions or project phases with unclear outcomes, the method makes visible what actually happened and what can be learned from it. It separates course, effect, and causes so experience turns into solid improvement.For a disturbance that's hard to pin down, the method cleanly separates problem, cause, and decision. It reduces mixing when symptoms allow several interpretations.For a single, hard-to-explain deviation, the method exposes the causal chain behind the visible symptom. It keeps the cause open until a controllable condition emerges instead of a mere description.
Complexitydifferent
MediumLowHighLow
Timedifferent
Ongoing20-45 min2-8 h15-30 min
Participantsdifferent
2-123-122-82-6
Formatdifferent
Workshop + asyncWorkshop + asyncWorkshop + asyncWorkshop
Outputdifferent
Kanban board, WIP policies, Flow metricsLessons learned, Action items, Event summaryProblem Analysis, Decision Analysis, Risk PlanRoot cause notes, Countermeasures
Tagsno overlap
FlowVisual managementDelivery
LearningOperationsImprovement
Problem solvingRoot causeDecisionOperations
Root causeIncidentLeanProblem solving
Add more methods