methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Views and Beyond method illustration showing its working structure
Architecture
Views and Beyond
A paper-based illustration representing arc42 with its core stages and visible working result.
Architecture
arc42
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.Views and Beyond organizes architecture into several views so no single diagram has to do everything at once. This makes it possible to choose the representation that fits the stakeholder's question.arc42 structures architecture knowledge so teams can document system, decisions, and risks consistently. The template builds a living understanding of the architecture instead of scattered notes.
Complexitydifferent
MediumLowMediumLow
Timedifferent
Ongoing15-45 min1-3 Tage1-2 Tage
Participantsdifferent
2-121-31-41-4
Formatdifferent
Workshop + asyncAsyncWorkshop + asyncWorkshop + async
Outputdifferent
Kanban board, WIP policies, Flow metricsADR File, Decision Log, RationaleArchitecture Views, Cross-view Notes, RationaleArchitecture Document, Context View, Runtime View, Deployment View
Tagsno overlap
FlowVisual managementDelivery
ArchitectureRationaleDocumentationGovernance
DocumentationStakeholdersArchitecture
ArchitectureDocumentationCommunication
Add more methods