methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Paper illustration for Three-Point Estimation.
Decision Making
Three-Point Estimation
Paper illustration for PERT Estimation.
Decision Making
PERT Estimation
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.A single estimate for effort, time, or risk often looks too smooth for the real uncertainty behind it. It separates options, evaluation criteria, and open risks. The result is captured as a Three-Point Estimate, Risk Range, and Assumption Notes.On complex initiatives, a plain average tends to understate just how uncertain the outcome really is. It separates options, evaluation criteria, and open risks. The result is captured as a PERT Estimate, Expected Value, and Risk Notes.
Complexitydifferent
MediumLowMediumMedium
Timedifferent
Ongoing15-45 min10-30 min je Item15-45 min
Participantsdifferent
2-121-31-81-8
Formatdifferent
Workshop + asyncAsyncWorkshop + asyncWorkshop + async
Outputdifferent
Kanban board, WIP policies, Flow metricsADR File, Decision Log, RationaleThree-Point Estimate, Risk Range, Assumption NotesPERT Estimate, Expected Value, Risk Notes
Tagsno overlap
FlowVisual managementDelivery
ArchitectureRationaleDocumentationGovernance
EstimationUncertaintyForecasting
EstimationUncertaintyRisk
Add more methods