methodatlas
Compare

View methods side by side.

Choose up to four methods. Add them using the search and share the comparison by copying its link.

Criterion
Paper illustration of a four-column Kanban board with limited ongoing work, a visible blocker and a review loop.
Engineering
Kanban
Paper illustration of two considered options leading to a decision record with a marked status and visible consequences.
Architecture
Architecture Decision Record
Paper illustration for Communication Plan
Delivery
Communication Plan
Views and Beyond method illustration showing its working structure
Architecture
Views and Beyond
Purposedifferent
When work sits in too many parallel streams, throughput suffers and no one sees the bottlenecks. Kanban makes the flow of work visible and limits overload so a system becomes calmer and more predictable.An ADR permanently records an architecture decision with context, trade-offs, and consequence. It creates continuity for later changes because the decision path stays traceable.When many people need to be informed in parallel and messages would otherwise arrive unevenly or too late, a Communication Plan orders communication reliably. Channels, audiences, and cadences interlock so important information doesn't get lost.Views and Beyond organizes architecture into several views so no single diagram has to do everything at once. This makes it possible to choose the representation that fits the stakeholder's question.
Complexitydifferent
MediumLowLowMedium
Timedifferent
Ongoing15-45 min45-90 min1-3 Tage
Participantsdifferent
2-121-32-61-4
Formatdifferent
Workshop + asyncAsyncWorkshop + asyncWorkshop + async
Outputdifferent
Kanban board, WIP policies, Flow metricsADR File, Decision Log, RationaleCommunication Plan, Channel Matrix, Message CadenceArchitecture Views, Cross-view Notes, Rationale
Tagsno overlap
FlowVisual managementDelivery
ArchitectureRationaleDocumentationGovernance
CommunicationStakeholdersDeliveryPlanning
DocumentationStakeholdersArchitecture
Add more methods